Installed Capacity: 42.2kW (DC)
Modules: 87 Hanwha Duo XL-G10 c/BFG 485W
Inverter: 3 SOL-ARK-15K-LV (208V)
Date Placed into Service: N/A
Installed Capacity: 42.2kW (DC)
Modules: 87 Hanwha Duo XL-G10 c/BFG 485W
Inverter: 3 SOL-ARK-15K-LV (208V)
Date Placed into Service: N/A
Installed Capacity: 29.1kW (DC)
Modules: 60 Hanwha Q-Peak DUO XL-G10.3/BFG 485 (2021) 485W
Inverter: 1 PVI 25TL-480 Yaskawa Solectria Solar
Date Placed into Service: 10/11/2022
Installed Capacity: 51.84kW (DC)
Modules: 108 Hanwa Duo XL-G10.d 480
Inverter: 1 SE40KUS SolarEdge
Date Placed into Service: 4/24/2023
Verizon selected Stellar Solar to install a 327kW System with 994 SunPower modules, and 16 inverters.
Installed Capacity: 120.36kW (DC)
Modules: 250 480W Hanwha Q. Peak DUO XL-G10.3
Inverter: 1 SE100KUS SolarEdge
Date Placed into Service: 9/1/2022
Installed Capacity: 50.4kW (DC)
Modules: 105 Hanwha Q.Peak DUO XL-G10 480W
Inverter: 1 SolarEdge 43.2kW
Date Placed into Service: 8/30/2022
Installed Capacity: 19.2 kW (DC)
Modules: 40 Hanwha Q-cells Q Peak Duo XL-G10.2/BFG 480W
Inverter: 1 SE17.3KUS SolarEdge
Date Placed into Service: 3/29/2022
Palomar College chose Stellar Solar to install a 6179.62kW (DC) solar system consisting of 1,446 SunPower modules and 22 SMA Sunny Tripower 24000TL-US inverters.
Installed Capacity: 65kW (DC).
Modules: 135 x Hanwha Q Cells, Q.Peak DUO XL-G10.3/BFG 480 Watt Panels
Inverter: 1 SE43.2K SolarEdge
Date Placed into Service: 3/17/2022
Installed Capacity: 103.68kW (DC)
Modules: 216 Hanwha DUO XL-G10.d 480W
Inverter: 1 SE100KUS Solaredge
Date Placed into Service: 10/20/2022