Cedars-Sinai Hospital

Los Angeles, CA

  • Installed Capacity: 285 kWp
  • Modules: 1,100 x Suntech 240-watt modules
  • Inverter: 30 x SMA Sunnyboy Inverters
  • Date Placed into Service: 2/2013

Stellar Solar is proud to announce the February, 2013 activation of a solar car-port system that is part of the new Cedars Sinai LEED Platinum expansion. The system incorporates 1,100 SunTech 240 watt panels in multiple locations atop the hospital parking garage in the heart of Beverly Hills and utilizes 30 SMA Sunnyboy inverters. Graycore Construction was the general contractor assisting with this project.