Battery: 1 BYD Chess 60kW 266kWh ESS with Acumen EMS Control Center
Date Placed into Service: 10/19/2023
Stellar Solar Installed 1 BYD Chess 60kW 266kWh ESS with Acumen EMS Control Center ESS system for Marten Transport in Mira Loma.
In addition, two carport structures were installed consisting of 564 SPR-P17-350-COM 350W Sunpower Modules, and 2 SMA 20,000TL-US-10 Tripower inverters.