Marten Transport- Mira Loma ESS All Energy

Jurupa Valley, CA

  • Installed Capacity: 197kW (DC)
  • Modules: 564 SPR-P17-350-COM 350W Sunpower Modules
  • Inverter: 2 SMA 20,000TL-US-10 Tripower inverters
  • Battery: 1 BYD Chess 60kW 266kWh ESS with Acumen EMS Control Center
  • Date Placed into Service: 10/19/2023

Stellar Solar Installed 1 BYD Chess 60kW 266kWh ESS with Acumen EMS Control Center ESS system for Marten Transport in Mira Loma. 

In addition, two carport structures were installed consisting of 564 SPR-P17-350-COM 350W Sunpower Modules, and 2 SMA 20,000TL-US-10 Tripower inverters.