Capistrano Mazda

San Juan Capistrano, CA

  • Installed Capacity: 103.68kW (DC)
  • Modules: 216 Hanwha DUO XL-G10.d 480W
  • Inverter: 1 SE100KUS Solaredge
  • Date Placed into Service: 10/20/2022

Mazda Capistrano selected Stellar Solar to install a 103.68kW (DC) roof top solar system with 216 Hanwha DUO XL-G10.d 480W and 1 SE100KUS SolarEdge inverter.